Papagayo, Costa Rica
Due to rapid growth of the resort, a 500,000 gpd wastewater treatment facility was required to meet the construction schedule. This system was designed, fabricated and installed in only 4 months.
This modular, packaged system includes: flow equalization, SBR treatment, clean water storage and disinfection, as well as an aerobic sludge digester.








